Client: The Highland Council

As Principal Contractor, RJ McLeod delivered the construction of a new swing bridge over the Caledonian Canal, together with the associated road infrastructure forming Stage 2 of the Inverness West Link. The Project included demolition of a former clubhouse, construction of a new roundabout, approach roads, footpaths and an underpass, together with extensive M&E design and installation. The works also comprised construction of sheet piled abutments and wharf structures, with the new 40m-span hydraulic swing bridge constructed adjacent to the existing crossing. Variable message signs were installed to manage traffic movements during bridge openings, with landscaping and tree planting completing the project.

Principal Elements

  • Surfacing 21,000m2

  • Earthworks (cut) 50,000m3 

  • Earthworks (fill) 50,000m3

  • Sheet piling 3,500m2

  • Concrete 4,000m3   

  • Underpass 1 no.

  • Timber Jetty 1 no.   

  • SUDS ponds 3 no.  

  • Steel hydraulic swing bridge 40m span

  • Deep drainage 4m  

  • Parapets and safety barriers 350m

  • Puddle clay lining (canal) 1,500m3

Points of Interest

  • Located on the A82, requiring extensive traffic management

  • Detailed design coordination of hydraulic systems, mechanical components and bridge construction

  • Installation of cofferdams and large-scale pumping within the Caledonian Canal

  • Extensive utility installations and service diversions

  • Maintaining positive relationships with local residents, businesses and stakeholders throughout the project

  • Detailed planning and programming to coordinate all phases of the works