Glenfalloch Hydro Electric Scheme

  • RJ Mcleod
  • Jun 8, 2016
  • 1 min read

Updated: Jun 6


Client: Glenfalloch Estate

The project was for the construction of two run-of-river hydro-electric schemes – Upper Falloch (0.9MW) and Derrydarroch (1.9MW) – within the Glenfalloch Estate near Crianlarich. The works included 2 powerhouses, 6 intake structures with associated screen and flow arrangements, pipeline, new permanent access track, upgraded access track and temporary access track. Also included was the construction of 3 river-crossing bridges, 2 permanent access track bridges, a railway bridge and trunk road crossing and the installation of 3.5km of 11kV cable.

Principal Elements

  • Access track (new) 6km

  • Access track (upgraded) 3km

  • Access track (temporary) 1km

  • Pipeline 8.5km

  • Cable (11kV) 3.5km

Points of Interest

  • Close liaison with landscape, ecological and archaeological experts throughout the duration of the works

  • Adherence to strict planning conditions in order to minimise visual and other impacts

  • Installation of safety and diversionary signage for visitors given close proximity of the West Highland Way

  • Fulfilment of 15 job vacancies for the term of the contract