Client: Glenfalloch Estate
The project was for the construction of two run-of-river hydro-electric schemes – Upper Falloch (0.9MW) and Derrydarroch (1.9MW) – within the Glenfalloch Estate near Crianlarich. The works included 2 powerhouses, 6 intake structures with associated screen and flow arrangements, pipeline, new permanent access track, upgraded access track and temporary access track. Also included was the construction of 3 river-crossing bridges, 2 permanent access track bridges, a railway bridge and trunk road crossing and the installation of 3.5km of 11kV cable.
Principal Elements
Access track (new) 6km
Access track (upgraded) 3km
Access track (temporary) 1km
Pipeline 8.5km
Cable (11kV) 3.5km
Points of Interest
Close liaison with landscape, ecological and archaeological experts throughout the duration of the works
Adherence to strict planning conditions in order to minimise visual and other impacts
Installation of safety and diversionary signage for visitors given close proximity of the West Highland Way
Fulfilment of 15 job vacancies for the term of the contract