We were Principal Contractor for the construction of a new 1.4km link road, designed to ease congestion in and around Denny Cross. The project included earthworks (cut/fill), construction of pavements, culvert and SUDS pond, installation of streetlighting, signage, fencing and landscaping.
Principal Elements
Excavation/deposition 10,000m3
Topsoil strip/deposition 5,000m3
Ducting 600m
Stormwater drainage 2,000m
Manholes/catchpits 115 no.
Drainage gravel 7,140m3
Imported Class 1 material 19,000m3
Capping (6F5) 4,500m3
Kerbing 2,000m
Pre-cast concrete box culvert 1 no.
Type 1 sub-base 4,000m3
Surfacing 9,500m2
Points of Interest
Several utility diversions being managed through the works including 3 no. 33/11kv overhead line SPEN diversions and a BT Openreach diversion
Scottish Water watermain protection works
Installation of new 24m-long box culvert to permanently divert Little Denny Burn
Localised areas of ground improvement works requiring excavation and replacement with engineering fill to a maximum of 4m below ground level
Management of existing Public Rights of Way requiring to be diverted and maintained throughout
Liaison with school in close proximity to the works
Extensive Community Benefits in place including providing local employment, engaging with local schools and engaging with local supply chain