Auchteraw Battery Energy Storage System

  • 17 hours ago
  • 1 min read

Client: Powersystems UK Ltd

The project comprised the construction of a 49.9MW Battery Energy Storage System (BESS) facility near Fort Augustus, including associated drainage, civil engineering and electrical works.

 

Our teams delivered the construction of the substation and associated infrastructure, together with a cable route connecting the site to the Fort Augustus Substation.

 

The works included earthworks, reinforced concrete plant foundations, cable and earth ducting, drainage, road widening, construction of a new site access bellmouth and service.

Principal Elements

  • Earthworks 5,000m2

  • Concrete foundations 300m3

  • Surfacing 200m2

  • Drainage 670lm

  • Cable ducting 2,200lm

  • Security fencing 1,450lm

  • 57 week programme

Points of Interest

  • Planning restrictions limited delivery vehicles to two per hour through the village of Auchteraw

  • Construction delivered to a challenging programme while the design continued to develop

  • Management of changing work scope throughout the ongoing design development

  • Working to rigorous safety standards

  • Close coordination of overlapping civil engineering and electrical works