Aggreko Infrastructure Works

  • RJ Mcleod
  • May 12, 2022
  • 1 min read

Updated: Jun 12



Client: Aggreko Infrastructure Works

We were the Principal Contractor on this project which was located in Dumbarton and was for the construction of a new access road, car park and fleet yard. It included site clearance, earthworks, drainage, road/footpath and reinforced concrete slab construction as well as the construction of 2 no. portal frame structures. Also included were electrical works, the installation of perimeter fencing and landscaping.

Principal Elements

  • Earthworks 3,500m3

  • Road / footpath construction 1,500m2

  • RC concrete slab 7,200m2

  • New car park 10,000m2

Points of Interest

  • New electrical infrastructure installed adjacent to existing live services

  • Close liaison with utility providers and Client’s electrical engineers to deliver each phase

  • New car park constructed in an area with difficult ground conditions

  • Large scale industrial concrete slab poured using armoured joints

  • Attenuation system 540m3 (45m long x 15m wide x 0.8m deep), installed in difficult ground conditions