| Client |
Transport Scotland |
| Value |
£2.18M |
| Engineer |
Scotland TranServ |
| Programme |
52 Weeks |
| Contract Form |
Measure and Value |
| Completed |
2010 |
The works comprised the demolition of the superstructure of the existing three-span, 250t reinforced concrete bridge and its replacement with a new 32m three-span bridge deck of composite steel and reinforced concrete. The existing piers were partially cut down and retained for use as part of the new superstructure. To allow traffic to be maintained on the A82 during the works a 36m single-span temporary bridge and carriageway was constructed immediately adjacent to the existing bridge on the west of the existing carriageway. Temporary traffic management was required throughout the works to control traffic and provide access to the site.
Principal Elements included: Surfacing 2,700m2
Key Issues: