Infrastructure

Longannet Coal Plant Drainage

Client
Scottish Power Generation Ltd
Value
£0.45M
Engineer
Mott MacDonald
Programme
14 Weeks
Contract Form
ICE 7th
Completed
2009


The project was for the construction of an enlarged flow balancing pond, the enlargement and improvement of a settlement pond, the installation of connecting pipework and manholes and the construction of a landscaping bund.

Principal Elements included:

Excavation of blaise/clay 9,900m3 / Fill of blaise/clay 4,500m3

Drainage 275m (the majority of which 900mm diameter)

Chain Link Security Fence 400m / 6F1 2,300T

FBA 3,000T / Geogrid 4,800m2

 

  

Key Issues:

  • Monitoring of overpumping works to ensure drainage system operational
  • Close liaison with operational activities at adjacent coal fired Longannet Generation Plant