Knocknagael.jpg whitespacer.jpg Knocknagael 1.JPG
Energy

Knocknagael Substation, Inverness

Client
Scottish Hydro Electric Transmission Ltd
   

Designer

 

Waterman Group

 

Programme

 

52 Weeks

 

Contract Form

 

NEC 3 Option B

 

Completed

 

2011

 


The contract is for the construction of the substation platform and control building, together with electrical infrastructure foundations, cable and earth trenching (by both open trench method and precast trench installation), drainage and on-site roadways and improvements to approach junctions and access roads. 

 

Principal Elements include:

Excavation 214,131m3

Fill 247,709m3

Concrete 3,000m3

Platform 50,000m2

Access Road Improvements 3.6km

 

 

 

Key Issues:

  • Protection of environment especially watercourses below site
  • Dealing with potentially difficult and weather susceptible excavated material