Head Office/Registered Office

2411 London Road
Glasgow
G32 8XT

Tel: 0141 764 2411
Fax: 0141 764 2434

 

North Office
Strathpeffer Road
Dingwall
IV15 9XB

Tel: 01349 860000
Fax: 01349 860005

Infrastructure

Home Farm Phases I - V, Portree

Client
Robertson Construction Ltd
Value
£4.50m
Designer
Cameron & Ross
Programme
98 Weeks
Contract Form
Measure and Value
Completed
2007

The project involved the construction of the infrastructure works for a housing development on a green field site consisting of 250 properties spread across Phases I - V. The scope of the works included earthworks, roadworks, drainage works, services and landscaping. One of the main features within Phase I was the construction of a double box culvert which formed the main access to the new site across an existing river. The success of the contract has depended mainly on negotiation with the Client by using the excavated gravel on site as infill, crushing the extracted rock from Phase II and minimising disposal off site by utilising the woodland areas for disposing unsuitable soils. This assisted in controlling costs and ensured our continuation on site from Phase I through to Phase V.

Principal Elements included:

104,000m3 Earthworks
25,000m3 Import Fill and Capping
34m Double Box Culvert (2.7m x 3.3m)
9,500m Drainage Works
24,000m2 Roadways
6,000m2 Cycleway/Footway
Detention Basins @ 2 no. (Capacity 1600m3)
15,000m Services/Utilities

 

 

Key Issues:

  • Co-ordination and programming of works to ensure access for follow-on sub-contractors
  • Negotiation with the Client to agree further works - Phase 1 awarded initially - Phases 2 - 5 on completion of Phase 1
  • All materials excavated on site re-cycled on site, minimising import and disposal costs
  • Provision of Value Engineering solutions by re-cycling excavated materials