Client
|
Falck Renewables Ltd
|
|
Turnkey Contractor
|
Nordex UK Ltd
|
|
Size
|
16 x 2.5MW + 4 x 2.5MW
|
| Programme |
44 Weeks (completed 2007) + 18 Weeks (completed 2008)
|
| Contract Form |
Lump Sum
|
Following on from the £0.20M enabling works contract completed in 2006, the Company also carried out the construction of access tracks and 16 no. reinforced concrete wind turbine bases with crane hardstanding and cable trenches between turbines, through environmentally sensitive terrain. Road alignment was limited due to the rare mountain habitat of montane heath. Culverts, small bridges, crane hardstandings and cable trenching are also included in the scope. On-site borrow pits were utilised to win general rockfill and processing of this was carried out on site to produce other materials. The construction of a sub-station was also included in the contract.
The extension was completed over an 18-week period in 2008 and consisted of the construction of 2.5km of access tracks and 4 no. reinforced concrete wind turbine bases with crane hardstanding and cable trenches between turbines.
RC wind turbine bases: 16 no. + 4 no. (320m3 each)
Upgraded track: 2km
New track: 9km + 2.5km