Garry Gualach Power House

Client
Innogy plc
   
Programme
30 Weeks (completed 2002)
Contract Form
Design and Build
   

The project involved the construction of an 800m access track including bridge. Excavation and laying of 650m of 900ø GRP pipe and 650m of 800ø GRP pipe, construction of concrete weir intake with associated screen and power house of RC base, block walls, timber truss roof with tiles. Installation of mechanical and electrical components, turbine generator hydraulics, panel and associated equipment.

 

Principal Elements included:

650m 900ø GRP pipe
650m 800ø GRP pipe

 

Key Issues:

  • Project designed to blend in with surrounding area
  • Consultation with SNH and SEPA regarding environmental aspects.